Google Technology Center

Location: The Dalles, OR
Overview: This Google Technology Complex was constructed over an 18 month period that included a variety of buildings and facilities. Design Structures was involved in the construction of all buildings as well as the design of several including the main technology buildings, a lodging facility, and the main administration building. The project had a tight timeline to bring the facility online and was challenged by the design and redesign of the complex that was ongoing throughout the construction time. The internal buildout of the buildings included extensive raised flooring covering almost 200,000 sf of the floor as well as office and other improvements for the staff and operation of the facility.